[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
:: Volume 6, Issue 2 (8-2020) ::
2020, 6(2): 185-228 Back to browse issues page
Optimal Mixture of Electricity Production Under Uncertainty: Case of Western Azerbaijan Province
Zahra Ddalal-Bashy * , Kiumars Shahbazi , Zeinalabedin Sadeghi
Eurumieh University
Abstract:   (4013 Views)
In recent years, optimal use of fossil fuels, reduction of environmental pollution and exploitation of renewable energy is one of the most important issues in the policies of different countries, and as you know, Iran's electricity industry is dependent on fossil fuel consumption strongly, which causes environmental pollution. The aim of this study is to obtain the optimal combination of electricity production plants in despite the uncertainties in the required components in decision making, in order to minimize environmental pollution and production costs. In this study, two-stage stochastic programming and interval parameter linear programming have been used to minimize uncertainty in electricity generation planning and fossil energy consumption. From one side, stochastic programming with considering different scenarios and from another side interval parameter instead of pointwise data minimize uncertainty in this study. Also, in obtaining the results, the data of the electricity industry report of West Azerbaijan province in 1394, 1395 and 1396 have been used. The results of this study show that the amount of production of combined cycle power plants and hydropower plant in this province is less than the optimal amount, And the amount of gas power plant's production in this province is more than the optimal amount. It is also necessary to plan for the development of capacity in the Khoi Combined Cycle Power Plant.
Keywords: optimal mixture of electricity production, Renewable Energy, Non-Renewable Energy, two-stage stochastic programming, Uncertainty
Full-Text [PDF 815 kb]   (633 Downloads)    
Type of Study: Research | Subject: Special
Received: 2020/07/9 | Accepted: 2020/09/9 | Published: 2020/08/31
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Ddalal-Bashy Z, Shahbazi K, Sadeghi Z. Optimal Mixture of Electricity Production Under Uncertainty: Case of Western Azerbaijan Province. Quarterly Journal of Energy Policy and Planning Research 2020; 6 (2) :185-228
URL: http://epprjournal.ir/article-1-830-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 6, Issue 2 (8-2020) Back to browse issues page
مجله پژوهش های برنامه ریزی و سیاستگذاری انرژی Journal of Energy Planning And Policy Research
Persian site map - English site map - Created in 0.05 seconds with 37 queries by YEKTAWEB 4660